WHERE TO USE:
• Monolithic construction joints between fresh and hardened concrete.
• Bonding precast concrete elements.
• Bonding steel to concrete.
• Filling cracks in concrete
TECHNICAL DATA:
Consistency: comp. A: fluid paste;
comp. B: fluid paste.
Colours: comp. A: black; comp. B: white.
Mixing ratio: comp. A : comp. B = 3 : 1.
Setting time: 24 hours.
Workability time: 60 minutes.
Open time: 5 hours.
Storage: 24 months.
Application: brush, trowel or by pouring.
Consumption: 1.35 kg/dm³.
Packaging: 2 kg and 10 kg kits.